Downloading Receipts

Once a DER Distributed Energy Resources. Distribution level resources which produce electricity or actively manage consumer demand (examples include solar rooftop PV systems and batteries, and demand response via hot water systems, pool pumps, smart appliances and air conditioning control). device has been installed and recorded in the DERR DER Register, NSPs can view and download a receipt for the installation. The receipt provides a summary of the installation and confirmation that the job is complete.

This topic describes how to view and download the receipt.

Before you begin

Ensure that:

  • The installation job has been completed,
  • The job has been recorded in the DERR Portal, and
  • You have a valid NMI, Job Number and Installer ID to access the receipt.

To download the receipt

  1. From the Markets Portal, navigate to DERR > Confirmation Receipts. The Download Receipt page displays.

  2. On the Download Receipt page, enter the NMI, Job Number and Installer ID.
    Note: All these fields are mandatory. You cannot download the receipt if you do not enter all these details.
  3. Click Get Receipt. A PDF version of the Receipt is downloaded.

What's on the Receipt

The confirmation Receipt contains the following information.

Section

Description

Confirmation Date

Date when the installation was confirmed

Installer Details

Provides installer id details

Date record confirmed

Date when the job was completed

Installation Overview

Provides NSP details including:

a. NSP name

b. Job Number

c. NMI

d. Export limit

Installed system details

Provides a list of installed AC connection details, including:

a. Identifier

b. Type

c. No of AC connections

d. Capacity (kVA)

e. Total Capacity (kVA)

f. Manufacturer

g. Model Number

System source details

Provides a list of installed DER Device details, including:

a. Identifier

b. Type

c. No of devices

d. Source Capacity (kW)

e. Storage Capacity (kWh)

f. Manufacturer

g. Model Number