Role ID codes

For Roles and responsibilities, see MSATS Procedures: CATS procedure, principles, and obligations.

Participants are assigned a relationship to a NMI See Relevant Rules or Procedures in a nominated Role The role a company has with a connection point in CATS. A single company can have more than one role associated with a NMI., identifying their responsibility. Each Role associated with a NMI has obligations associated with that NMI. For example, if a participant is assigned the Role of LNSP, that participant takes on LNSP responsibilities for the NMI.

For any NMI, you can identify the participant allocated to each Role, for example, who is the LNSP, FRMP Financially Responsible Market Participant, usually a retailer, Generator, Market Customer or a Market Small Generator Aggregator, identified in respect of a connection point. Responsible for dealings with AEMO in relation to a specific load., RP Responsible Person. The participant with formal responsibility for the provision, installation and maintenance of a metering installation., MDP Meter Data Provider. An organisation which installs, commissions, gathers, and verifies data remotely from meters in the National Electricity Market (NEM)., and so on.

The NMI Master Record The NMI master record with an end date set to the year 9999. contains each Current The participant can receive files compliant to the current aseXML version. Role for each NMI. Each proposed Role for a NMI is referred to as a New Role.

The Role ID Codes are used to define: