ReasonForInter
Purpose – The reason for planned interruption.
Field |
Restrictions |
aseXML |
Schema |
---|---|---|---|
xsd:string enumerated list (see ReasonForInter) |
simple |
ElectricityEnumerations |
Table 83 ReasonForInter
Meter Exchange - Individual |
Meter Exchange – Rollout |
Meter Replacement - Family Maintenance |
Meter Test |
Meter Fault Investigation |
---|---|---|---|---|
Meter Installation - Additional |
Install Controlled Load |
Remove Meter |
Move Meter |
Meter Reconfiguration |
Distribution Works |
Other |
|
|
|