Name |
|
Comment |
MTPASA_CASESOLUTION is obsolete from 2017 End of Year DM4.27 Release. |
MTPASA_CASESOLUTION is public data. Source MTPASA_CASESOLUTION is updated each MTPASA run (i.e. weekly). Volume Rows per week: 1 Rows per month: 5 Monthly space increment is based on storing all the MT PASA solutions. To store only the latest solution, divide these figures by 5 (number of weeks per month rounded up). |
Name |
Comment |
Value |
Visibility |
Data in this table is: |
Public |
Name |
RUN_DATETIME |
RUN_NO |
Name |
LASTCHANGED |
Name |
Data Type |
Mandatory |
Comment |
RUN_DATETIME |
DATE |
X |
Date processing of the run begins. Generated from the solution file caseid |
RUN_NO |
NUMBER(3,0) |
X |
Unique run id. Generated from the solution file caseid |
PASAVERSION |
VARCHAR2(10) |
|
Version of the PASA solver used to solve this case |
RESERVECONDITION |
NUMBER(1,0) |
|
Low Reserve Condition (LRC) flag for the case (1 - LRC in the case, 0 - No LRCs in the case) for capacity run |
LORCONDITION |
NUMBER(1,0) |
|
Lack of Reserve Condition (LOR) flag for the case indicates the most severe condition in the case (3 = LOR3, 2 = LOR2, 1 = LOR1, 0 = No LOR) |
CAPACITYOBJFUNCTION |
NUMBER(12,3) |
|
Objective Function from the Capacity Adequacy run |
CAPACITYOPTION |
NUMBER(12,3) |
|
Not populated as of 2005 End of Year Release; was the demand forecast used for capacity adequacy assessment: 0 = no assessment, 1 = 10%, 2 = 50%, 3 = 90% |
MAXSURPLUSRESERVEOPTION |
NUMBER(12,3) |
|
Not populated as of 2005 End of Year Release; was the demand forecast used for assessment of Maximum surplus Reserve: 0 = no assessment, 1 = 10%, 2 = 50%, 3 = 90% |
MAXSPARECAPACITYOPTION |
NUMBER(12,3) |
|
Not populated as of 2005 End of Year Release; was the demand forecast used for assessment of Maximum Spare Capacity: 0 = no assessment, 1 = 10%, 2 = 50%, 3 = 90% |
INTERCONNECTORFLOWPENALTY |
NUMBER(12,3) |
|
The penalty for non-zero interconnector flow |
LASTCHANGED |
DATE |
|
Date and time the record was created or modified |
RUNTYPE |
VARCHAR2(50) |
|
Discontinued in Dec 2005; was description of the constraints included in this run, being either System Normal and Planned Outage Constraints or System Normal Constraints Only |
RELIABILITYLRCDEMANDOPTION |
NUMBER(12,3) |
|
Specifies the Probability of Exceedence (POE) demand forecast for Reliability LRC assessment (0 if no assessment, 10 for 10%, 50 for 50%, 90 for 90%) |
OUTAGELRCDEMANDOPTION |
NUMBER(12,3) |
|
Specifies the Probability of Exceedence (POE) demand forecast for outage LRC assessment (0 if no assessment, 10 for 10%, 50 for 50%, 90 for 90%) |
LORDEMANDOPTION |
NUMBER(12,3) |
|
Specifies the Probability of Exceedence (POE) demand forecast for LOR assessment (0 if no assessment, 10 for 10%, 50 for 50%, 90 for 90%) |
RELIABILITYLRCCAPACITYOPTION |
VARCHAR2(10) |
|
Generation Availability to be used in Reliability LRC run (either PASA or MARKET) |
OUTAGELRCCAPACITYOPTION |
VARCHAR2(10) |
|
Generation Availability to be used in Outage LRC run (either PASA or MARKET) |
LORCAPACITYOPTION |
VARCHAR2(10) |
|
Generation Availability to be used in LOR run (either PASA or MARKET) |
LORUIGFOption |
NUMBER(3,0) |
|
UIGF POE forecast availability used for this option |
ReliabilityLRCUIGFOption |
NUMBER(3,0) |
|
UIGF POE forecast availability used for this option |
OutageLRCUIGFOption |
NUMBER(3,0) |
|
UIGF POE forecast availability used for this option |
|
|
|