Table: MTPASA_REGIONSOLUTION

MTPASA_REGIONSOLUTION

Name

MTPASA_REGIONSOLUTION

Comment

MTPASA_CASESOLUTION is obsolete from 2017 End of Year DM4.27 Release.
The MTPASA_REGIONSOLUTION table shows the results of the regional capacity, maximum surplus reserve and maximum spare capacity evaluations for each day and ldcblock of the study.


Description

MTPASA_REGIONSOLUTION is public so is available to all participants.

Source

MTPASA_REGIONSOLUTION is updated each MTPASA run (i.e. weekly).

Volume

Rows per week: 29400

To store only the latest solution, divide these figures by 5 (number of weeks per month rounded up).


Notes

Name

Comment

Value

Visibility

Data in this table is:

Public


Primary Key Columns

Name

DAY

ENERGYBLOCK

LDCBLOCK

REGIONID

RUN_DATETIME

RUN_NO

RUNTYPE


Index Columns

Name

LASTCHANGED


Content

Name

Data Type

Mandatory

Comment

RUN_DATETIME

DATE

X

Date processing of the run begins

RUN_NO

NUMBER(3,0)

X

Unique run id. Generated from the solution file caseid

ENERGYBLOCK

DATE

X

Sunday at start of the week for this solutions energy block. Generated from the solution file energy block

DAY

DATE

X

Day this solution is for. Generated from the solution file periodid

LDCBLOCK

NUMBER(3,0)

X

LDC block this solution is for. Generated from the solution file periodid

REGIONID

VARCHAR2(10)

X

The unique region identifier

DEMAND10

NUMBER(12,2)

 

Input value for 10% probability demand

RESERVEREQ

NUMBER(12,2)

 

Not used from 21/05/2010. Prior to 21/05/2010: Input reserve requirement

CAPACITYREQ

NUMBER(12,2)

 

Not used from 21/05/2010. Prior to 21/05/2010: CA Demand + Reserve Requirement

ENERGYREQDEMAND10

NUMBER(12,2)

 

Sum of: (Region Period Demand - given Demand10)/PeriodLength(sum by Energy Block, entered in first period of energy block, GWh)

UNCONSTRAINEDCAPACITY

NUMBER(12,0)

 

Region energy unconstrained MW capacity subject to network security constraints

CONSTRAINEDCAPACITY

NUMBER(12,0)

 

Region energy constrained MW capacity subject to energy and network security constraints

NETINTERCHANGEUNDERSCARCITY

NUMBER(12,2)

 

Calculated in capacity adequacy evaluation: Export if > 0, Import if < 0.

SURPLUSCAPACITY

NUMBER(12,2)

 

Regional surplus capacity MW, +/- values indicate surplus/deficit capacity

SURPLUSRESERVE

NUMBER(12,2)

 

Not used from 21/05/2010. Prior to 21/05/2010: Regional reserve surplus. +/-0 values indicate surplus/deficit reserve

RESERVECONDITION

NUMBER(1,0)

 

The regional reserve condition: 0 = Adequate, 1 = LRC

MAXSURPLUSRESERVE

NUMBER(12,2)

 

The Maximum generation (MW) that could be withdrawn from this region without incurring a Low Reserve Condition.

MAXSPARECAPACITY

NUMBER(12,2)

 

The Maximum Spare Capacity evaluated for this region in this period. Calculated for each region in turn

LORCONDITION

NUMBER(1,0)

 

The LOR Condition determined from the Maximum Spare Capacity value: 0 = no condition, 1 = LOR1 condition, 2 = LOR2 condition, 3 = LOR3 condition

AGGREGATECAPACITYAVAILABLE

NUMBER(12,2)

 

Sum of MAXAVAIL quantities offered by all Scheduled Generators in a given Region for a given PERIODID.

AGGREGATESCHEDULEDLOAD

NUMBER(12,2)

 

Sum of MAXAVAIL quantities bid by of all Scheduled Loads in a given Region for a given PERIODID.

LASTCHANGED

DATE

 

Date the solution was loaded

AGGREGATEPASAAVAILABILITY

NUMBER(12,0)

 

Sum of PASAAVAILABILITY quantities offered by all Scheduled Generators in a given Region for a given PERIODID.

RUNTYPE

VARCHAR2(20)

X

Type of run. Values are RELIABILITY_LRC and OUTAGE_LRC

CALCULATEDLOR1LEVEL

NUMBER(16,6)

 

Region Reserve Level for LOR1 used. Can be static value or calculated value if an interconnector is a credible contingency

CALCULATEDLOR2LEVEL

NUMBER(16,6)

 

Region Reserve Level for LOR2 used. Can be static value or calculated value if an interconnector is a credible contingency

MSRNETINTERCHANGEUNDERSCARCITY

NUMBER(12,2)

 

Net interconnector flow from the region for this interval from the MSR assessment

LORNETINTERCHANGEUNDERSCARCITY

NUMBER(12,2)

 

Net interconnector flow from the region for this interval from the LOR assessment

TOTALINTERMITTENTGENERATION

NUMBER(15,5)

 

Allowance made for non-scheduled generation in the demand forecast (MW).

DEMAND50

NUMBER(12,2)

 

Input value for 50% probability demand

DEMAND_AND_NONSCHEDGEN

NUMBER(15,5)

 

Sum of Cleared Scheduled generation, imported generation (at the region boundary) and allowances made for non-scheduled generation (MW).

UIGF

NUMBER(12,2)

 

Regional aggregated Unconstrained Intermittent Generation Forecast of Semi-scheduled generation (MW).

SEMISCHEDULEDCAPACITY

NUMBER(12,2)

 

Aggregate Regional UIGF availability

LOR_SEMISCHEDULEDCAPACITY

NUMBER(12,2)

 

Aggregate Regional UIGF availability for LOR

DEFICITRESERVE

NUMBER(16,6)

 

Regional reserve deficit (MW)

MAXUSEFULRESPONSE

NUMBER(12,2)

 

The Maximum market response (MW) needed for the region to eliminate a Low Reserve Condition (LRC)

MURNETINTERCHANGEUNDERSCARCITY

NUMBER(12,2)

 

Net interconnector flow from the region for this interval from the MRR assessment

LORTOTALINTERMITTENTGENERATION

NUMBER(15,5)

 

Allowance made for non-scheduled generation in the LOR assessment

ENERGYREQDEMAND50

number(12,2)

 

Sum of: (Region Period Demand - given Demand50)/PeriodLength (sum by Energy Block, entered in first period of energy block, GWh)